    Construction Performance by Division

    질문주시면 빠른 시간내에 피드백드리겠습니다.

    City Gas Works

    NO Construction Name Amount Period Client
    197 Supply pipe construction around 145 Yeonhwa 1-gil, Gijang-eup (Yeonhwa-ri 170) 434,965,000 25.05~25.10 Busan City Gas Co., Ltd.
    196 EDC single-family home section 3 (8 blocks) city gas supply pipe construction (consignment) 264,332,000 25.04~25.08 Busan City Gas Co., Ltd.
    195 Hwangnyeong-daero 319 Street sidewalk expansion work - paving 93,447,273 24.12~25.03 Busan City Gas Co., Ltd.
    194 Eco Delta City (EDC) single-family home block 7 supply pipe construction 632,956,000 24.10~25.02 Busan City Gas Co., Ltd.
    193 3-6 Nakdongnam-ro 1013beon-gil, Jinmok Village area supply pipe construction (3176-34, Myeongji-dong) 402,444,000 24.05~24.11 Busan City Gas Co., Ltd.
    192 Supply pipe construction around 9, Chungmudaero 149beona-gil (542-1, Nambumin-dong) 100,372,000 24.03~24.05 Busan City Gas Co., Ltd.
    191 Hot spring area 4 medium and low pressure pipe and GOV installation work 248,969,000 24.01~24.12 Busan City Gas Co., Ltd.
    190 City gas positive pressure facility separation construction 205,000,000 23.10~24.02 Hankook Carbon Co., Ltd.
    189 Medium pressure pipe laying work between KOGAS Jinhae Management Center and Busan Noksan Industrial Complex, Phase 2, Section 2 350,194,900 23.02~23.12 Busan City Gas Co., Ltd.
    188 Bridge B removal and low-pressure pipe connection work around Jinnam-ro 9 (Daeyeon-dong 1742-1) 117,448,100 23.03~23.06 Busan City Gas Co., Ltd.
    187 Eileen’s Garden supply pipe construction work at 383-1 Dongsam-dong 135,191,100 23.03~23.06 Busan City Gas Co., Ltd.
    186 [Receivables Metering] Unit price contract for regular replacement of large capacity meters in 2023 (1/2) 175,147,500 23.06~24.01 Busan City Gas Co., Ltd.
    185 Daeyeon-dong 1808 The Beach Prugio Summit Apartment medium/low pressure and GOV installation work 155,056,000 23.08~23.12 Busan City Gas Co., Ltd.
    184 Medium pressure pipe laying work between KOGAS Jinhae Management Center and Busan Noksan Industrial Complex, Phase 2, Section 2 318,359,000 23.02~23.05 Busan City Gas Co., Ltd.
    183 City gas relocation and disposal work following Yangjeong District 3 redevelopment: packaging 123,674,000 22.09~23.06 Busan City Gas Co., Ltd.
    182 City gas relocation and disposal work according to Yangjeong District 3 redevelopment 193,490,000 22.09~23.06 Busan City Gas Co., Ltd.
    181 Supply pipe relocation work (consignment) following road opening in Uam District 1 redevelopment area 201,766,000 22.09~23.06 Busan City Gas Co., Ltd.
    180 Supply pipe construction around Cheonma-ro 109 138,149,000 22.08~22.12 Busan City Gas Co., Ltd.
    179 Supply pipe construction around Cheolma-ro 438 266,925,000 22.06~22.10 Busan City Gas Co., Ltd.
    178 Supply pipe construction around 18-11, Cheonma-ro 131beon-gil 175,717,000 22.04~22.09 Busan City Gas Co., Ltd.
    177 Jungni Village supply pipe construction around 1100-7 Myeongji-dong 182,313,000 22.03~22.08 Busan City Gas Co., Ltd.
    176 Busan Port North Port Redevelopment District Stage 1-1 Medium Pressure Pipe Laying Construction 360,525,000 21.12~22.12 Busan City Gas Co., Ltd.
    175 Songdo Beach-ro 202 Hills E-Jin Bay medium, low pressure and GOV installation work (123-15, Amnam-dong) 152,208,000 21.11~22.02 Busan City Gas Co., Ltd.
    174 Beomcheon-dong 1187 Seomyeon the Central medium, low pressure and GOV installation work 190,683,000 21.10~22.01 Busan City Gas Co., Ltd.
    173 Medium, low pressure and zone regulator installation work around Saenggok-ro 42: Packaging 162,888,000 21.10~21.12 Busan City Gas Co., Ltd.
    172 Busan Naeri 1 gas boiler replacement work 752,779,091 21.08~21.12 LH Korea Land and Housing Corporation
    171 Goejeonghanshindeohyu supply pipe construction work at 216-10, Goejeong-dong 103,249,000 21.08~21.12 Busan City Gas Co., Ltd.
    170 Supply pipe construction around 607-22, Deokcheon-dong 130,629,000 21.08~21.12 Busan City Gas Co., Ltd.
    169 LH Busan area rental housing maintenance work 2,824,340,530 20.11 ~ 22.12 LH Corporation Busan Ulsan Regional Headquarters
    168 Gunsan Plant GF1 NGFS related piping construction 620,000,000 21.05 ~ 21.12 Korea Glass Industry Co., Ltd.
    167 Pressure reinforcement work around 3358-1, Myeongji-dong 149,819,000 21.05 ~ 21.08 Busan City Gas
    166 Newly built apartment building supply pipe construction at 69-1 Bongrae-dong 4-ga 219,321,000 20.11 ~ 21.03 Busan City Gas
    165 Yeonsan-dong 137-5 E-MART Traders medium pressure pipe installation work 135,302,000 20.08 ~ 20.12 Busan City Gas
    164 Spoone tennis court resurfacing work 272,078,654 20.08 ~ 20.12 Busan Regional Industrial Complex Spo One
    163 Low-pressure pipe LOOP between Janglim Hyeopseong APT and Jangnim-dong Big World and Jangnim Hyundai static pressure machine demolition work 115,892,000 20.07 ~ 20.12 Busan City Gas
    162 Mandeok Elementary School campus Bochado separation construction: packaging 141,812,700 20.07 ~ 20.10 Busan Metropolitan City Northern Office of Education
    161 Songjeong-dong 439-1 Songjeong-dong-seo GOV demolition and supply pipe LOOP construction 92,004,000 20.05 ~ 20.09 Busan City Gas
    160 Munhyeon-dong San 89-1 Munhyeon-gyeong-dong-riin apartment medium and low pressure pipe and GOV installation work 158,932,000 20.01 ~ 20.07 Busan City Gas
    159 Supply pipe construction around 1060 Saeteul Village in Gupo-dong (consignment construction) 96,145,000 20.01 ~ 20.06 Busan City Gas
    158 LOOP construction after opening Geumgang static pressure machine 108,028,000 19.11 ~ 20.03 Busan City Gas
    157 Supply pipe laying work (pavement) around the new building (Woobang Apartment) at 558 Hwajeon-dong 112,650,000 19.07 ~ 19.10 Busan City Gas
    156 Medium, low pressure and GOV installation work in Ilkwang residential area (Section 1) 381,160,000 19.06 ~ 19.12 Busan City Gas
    155 Supply pipe construction around San 74-5 in Jaesong-dong (piping) 100,764,000 19.07 ~ 20.01 Busan City Gas
    154 Single-family home supply pipe construction around 2BL in Mandeok District 5 160,045,000 19.08 ~ 20.03 Busan City Gas
    153 LOOP construction after opening Geumgang static pressure machine 105,460,000 19.11 ~ 20.02 Busan City Gas
    152 Korea Maritime and Ocean University city gas piping construction 131,555,491 19.03 ~ 19.06 Korea Maritime and Ocean University
    151 Medium and low pressure pipe and GOV installation work around 91-16 Mountain, Mora-dong (Mora-dongwon Apartment) 95,250,000 18.09 ~ 19.02 Busan City Gas
    150 Supply pipe construction around 41-1, Jinnam-ro 299beon-gil (Jeonpo-dong 330-881)/Section 2 (piping) 198,500,000 18.04 ~ 19.12 Busan City Gas
    149 Heat piping work for 15 additional users in Myeongji district 559,000,000 18.03 ~ 19.04 Busan City Gas
    148 Heat piping work for 15 additional users in Myeongji district 614,900,000 18.03 ~ 19.04 Busan City Gas
    147 Medium, low voltage and GOV installation work around Prugio Apartment, 29, Haedoji-ro 356beon-gil (212 Seodaesin-dong 1-ga) 20,3401,000 17.11 ~ 18.03 Busan City Gas
    146 Medium, low pressure and GOV installation work in Ilkwang residential area (Section 1) 416,273,000 17.06 ~ 18.12 Busan City Gas
    145 New heat-using facility heat piping work (Tomorrow O/T) 130,940,000 16.05 ~ 16.08 Busan City Gas
    144 Supply pipe construction around Haedoji-ro 183beon-gil 11 (Chojang-dong 131-96) 101,160,000 16.06 ~ 16.08 Busan City Gas
    143 District heating heat pipe emergency repair work (Singokjung Intersection) 129,600,000 16.06 ~ 16.09 Busan City Gas
    142 Yeonsan-dong 347-19 The Sharp Park City medium and low pressure pipe and GOV installation work 113,480,000 16.06 ~ 16.07 Busan City Gas
    141 599 Sirang-ri, Gijang-eup, Dongbusan Tourist Complex, medium and low pressure and GOV installation work (6th) 158,890,000 16.06 ~ 16.09 Busan City Gas
    140 City gas medium pressure pipe relocation work in flooded area in Jwadong-ri, Jangan-eup 178,460,000 16.06 ~ 16.09 Busan City Gas
    139 Supply pipe construction around Haedoji-ro 183beon-gil 11 (Chojang-dong 131-96) 101,160,000 16.07 ~ 16.12 Busan City Gas
    138 Steel structure construction for Busan Green Energy fuel cell power generation project 2,728,000,000 16.05 ~ 17.03 Samsung C&T
    137 #9CCL GAS PIPING 128,700,000 16.03 ~ 16.07 GBM Tech
    136 Myeongji district district energy project heat source facility construction work 221,100,000 16.01 ~ 16.09 Kolon Global
    135 Heavy pressure pipe installation work at San 47, Jwadong-ri, Gijang-eup, Heavy Ion Accelerator Treatment Center 41,844,000 15.11 ~ 16.02 Busan City Gas
    134 Yeonsan-dong 347-19 The Sharp Park City GOV installation work 146,828,000 14.09 ~ 16.06 Busan City Gas
    133 Heavy pressure pipe relocation work in flooded area in Jwadong-ri, Jangan-eup 196,306,000 16.01 ~ 16.04 Busan City Gas
    132 Supply pipe construction around 11, Haedoji-ro 183beon-gil 111,276,000 15.11 ~ 16.02 Busan City Gas
    131 Supply pipe construction around Dadae-ro 559-3 134,992,000 15.11 ~ 16.02 Busan City Gas
    130 Supply pipe construction around 15, Baekyang-daero 433beon-gil 49,753,000 15.11 ~ 16.01 Busan City Gas
    129 Oncheonnam-ro Suyeong Sewage Treatment Plant Medium Pressure Pipe Connection Work 77,594,000 15.07 ~ 15.10 Busan City Gas
    128 Supply pipe construction around Hwamyeong New City Road 2 68,959,000 15.06 ~ 15.09 Busan City Gas
    127 GOV installation work around Dongmun Good Morning Hill in Mandeok 2-dong 87,604,000 15.06 ~ 15.09 Busan City Gas
    126 Saenggok-dong International Industrial Logistics City medium pressure pipe construction 68,948,000 15.05 ~ 15.11 Busan City Gas
    125 Gupo 1-dong 1060-45 medium pressure pipe installation work 38,071,000 15.06 ~ 15.10 Busan City Gas
    124 Busan Jeonggwan district district heating pipe repair work 144,100,000 15.05 ~ 15.11 Busan Jeonggwan Energy
    123 2015Large-capacity meter replacement project 50,000,000 15.02 ~ 16.01 Busan City Gas
    122 Gwangan-dong 663-1 new apartment supply pipe construction work 38,687,000 15.01 ~ 15.03 Busan City Gas
    121 Haeundae Singok Middle School intersection heat pipe construction 38,390,000 14.12 ~ 15.02 Busan City Gas
    120 Dong-A University International Exchange Center Gas Piping Construction 47,032,700 14.10 ~ 15.08 Kyungdong Construction
    119 GOV installation work around Merville, Gyeongdong, 152-10, Anak 2-dong 49,841,000 14.11 ~ 15.04 Busan City Gas
    118 GOV installation work in Dongbusan Tourist Complex, 599 Sirang-ri, Gijang-eup 174,779,000 14.10 ~ 16.02 Busan City Gas
    117 Production of 16-inch (improved) and 8-inch launcher & receiver 102,300,000 15.02 ~ 15.03 Busan City Gas
    116 UST/#4CCL rationalization construction GAS PIPING 104,500,000 14.11 ~ 15.01 GBM Tech
    115 New heat-using facility heat piping construction (Cosmo City O/T, 345 households) 300,850,000 14.11 ~ 15.01 Busan City Gas
    114 599 Sirang-ri, Gijang-eup, Dongbusan Tourist Complex, medium and low pressure and GOV installation work (6th) 113,480,000 14.09 ~ 15.03 Busan City Gas
    113 Medium, low pressure and GOV installation work at The Sharp Park City, 347-19, Yeonsan-dong 113,480,000 14.09 ~ 15.03 Busan City Gas
    112 Includes gas piping work/gas leak breaker explosion-proof equipment/gas safety construction inspection 12,000,000 14.09 ~ 14.09 Hankook Carbon
    111 16-inch Launcher & Receiver robot input unit improvement manufacturing work 22,200,000 14.08 ~ 14.10 Busan City Gas
    110 2014 Busan Jeonggwan district district heating pipe construction 275,000,000 14.08 ~ 15.02 Busan Jeonggwan Energy
    109 Major rotating equipment repair work 44,970,000 14.07 ~ 14.08 Busan City Gas
    108 Maintenance work on major valves in the heat source facility 14,300,000 14.06 ~ 14.07 Busan City Gas
    107 New heat-using facility (Gyeongdong Hanamerville Apartment) heat piping work 158,200,000 14.05 ~ 14.07 Busan City Gas
    106 Garak-dong Joman Bridge ~ Haepo Elementary School Medium Pressure Pipe Laying Work 219,520,000 14.05 ~ 14.11 Busan City Gas
    105 Supply pipe construction work in Myeongji district, section 2-1 168,140,000 14.04 ~ 15.01 Busan City Gas
    104 Goejeongcheon Riverside Bridge Bridge Addition Piping Work 29,250,000 14.04 ~ 14.07 Busan City Gas
    103 Oxygen burner installation 22,500,000 14.02 ~ 14.03 Korea Fiber
    102 16-inch launcher and receiver production (robot input/recovery unit) 47,000,000 14.02 ~ 14.02 Busan City Gas
    101 Saenggok-dong Busan city sewage sludge medium pressure pipe construction work 67,150,000 14.01 ~ 14.05 Busan City Gas
    100 Gamcheon Port Logistics Center City Gas Piping Construction 43,400,000 13.12 ~ 14.01 National Federation of Fisheries Cooperatives
    99 Medium pressure pipe relocation work within the Beombang-dong International Industrial Logistics Complex section (consignment work) 56,990,000 13.12 ~ 14.12 Busan City Gas
    98 Supply pipe construction around Chungmu Saebyeok Market, 30-25 Chungmu-dong 1-ga 219,860,000 13.11 ~ 14.03 Busan City Gas
    97 Expired integrated calorimeter replacement work 35,780,000 13.10 ~ 14.04 Busan City Gas
    96 Gimhae District Constant Pressure In, Out-Let Piping Improvement Work 22,000,000 13.09 ~ 13.09 Busan City Gas
    95 Dadae 1-dong 1549-2 Dadae District 5 (Fuel Conversion) Medium Pressure Pipe Laying Work 67,080,000 13.07 ~ 13.11 Busan City Gas
    94 Middle East Hana Gyeongdong Merville new construction gas work 65,490,000 13.06 ~ 14.09 Kyungdong Construction Co., Ltd.
    93 The 3rd medium-pressure pipe relocation work for Gangbyeon Bridge within the Goejeong Stream ecological river construction section. 114,445,000 13.03 ~ 13.12 Busan City Gas
    92 Sewage sludge land treatment facility installation work 167,669,700 12.11 ~ 13.03 Daewoo Engineering & Construction
    91 Gamcheon 1-dong seafood processing complex medium pressure pipe construction: packaging 125,697,000 12.11 ~ 13.03 Busan City Gas
    90 Gamcheon 1-dong seafood processing complex medium pressure pipe installation work 161,161,000 12.11 ~ 13.03 Busan City Gas
    89 Medium and low pressure pipe relocation work around 834 Mandeok 2-dong 100,199,000 12.11 ~ 13.04 Busan City Gas
    88 UST/#8CCL City GAS pipe manufacturing and installation work 121,000,000 12.08 ~ 12.11 union steel
    87 Medium pressure pipe relocation work following demolition of 56-1 coastal bridge in Nakmin-dong 133,606,000 12.08 ~ 13.03 Busan City Gas
    86 Medium and low pressure pipe relocation work for Urban Railway Line 1 Extension Section 5 around 1160 Dadae 1-dong 244,470,000 12.04 ~ 12.09 Busan City Gas
    85 Jeonggwan-myeon Maehak-ri 793 Jeonggwan residential site supply pipe construction work 186,100,000 12.03 ~ 12.08 Busan City Gas
    84 Amnam-dong Gamcheon Port Logistics Complex Area Medium Pressure Pipe Laying Construction 2-1st 154,870,000 12.01 ~ 12.06 Busan City Gas
    83 Mieum-dong Mieum Industrial Complex Section 4 (Foreigners only) Medium pressure pipe relocation work 171,260,000 11.11 ~ 12.03 Busan City Gas
    82 Medium pressure pipe laying work from 1105-1, Munhyeon 4-dong to 259-1, Uam 1-dong 201,770,000 11.09 ~ 12.03 Busan City Gas
    81 Mieum-dong Mieum Industrial Complex Section 4 (Foreigners only) Medium pressure pipe relocation work 188,386,000 11.11 ~ 12.02 Busan City Gas
    80 Korea Glass Industry Co., Ltd. Busan Factory Natural Gas System Install 572,000,000 11.11 ~ 12.04 Korea Glass Industry
    79 New heat piping work (Haeundae, Middle East, Gyeongnam Honorsville, SH Tower Officetel) 456,160,000 11.11 ~ 11.12 Busan City Gas
    78 Replacement and supplementation work for heat transportation facilities at district energy supply facilities 354,446,600 11.10 ~ 12.01 Busan Metropolitan City
    77 Sanyang City Gas Piping Construction 126,500,000 11.11 ~ 11.12 goat
    76 Medium pressure pipe laying work throughout Munhyeon 4-dong 1105-1 ~ Uam 1-dong 259-1 231,594,000 11.09 ~ 12.02 Busan City Gas
    75 Line mark installation outsourcing (unit price contract) 106,200,000 11.07 ~ 11.10 Busan City Gas
    74 #6&7CCL gas piping work? 308,000,000 11.04 ~ 12.02 union steel
    73 Dadae 2-dong 37 Urban Railway Section 4 medium and low pressure pipe valve installation and relocation work 136,818,000 11.01 ~ 11.06 Busan City Gas
    72 Supply pipe construction work at 131-5 Gochon-ri, Cheolma-myeon, Gijang-gun 109,901,000 11.01 ~ 11.04 Busan City Gas
    71 Supply pipe construction work at 112-1 Ami-dong 2-ga 173,976,000 10.11 ~ 11.06 Busan City Gas
    70 New heat piping work (Haeundae KCC Switzen, SK VIEW) 128,680,000 10.11 ~ 10.12 Busan City Gas
    69 Gimhae KAL APT city gas conversion project 240,000,000 10.20 ~ 11.04 Korean Air
    68 Gijang Stadium-Samsung Intersection medium pressure pipe LOOP construction (Section 2) 101,948,000 10.09 ~ 11.12 Busan City Gas
    67 Busan Metropolitan City collective energy supply facility heat piping facility replacement and supplementation work 596,000,000 10.07 ~ 11.01 Sammi Construction
    66 Cheonghak 1-dong 341 Bukhang Bridge medium pressure pipe relocation work (Section 2) 95,854,000 10.06 ~ 11.08 Busan City Gas
    65 Jinju Namgang Bridge Medallion Construction 150,878,000 10.04 ~ 10.05 GSE
    64 Heat piping (SIS) construction - Dongsung Chemical 622,000,000 09.12 ~ 10.03 Busan City Gas
    63 Daejeo 2-dong 3918 Gonghang-ro medium pressure pipe relocation work (Section 1) 115,680,000 09.12 ~ 10.02 Busan City Gas
    62 Medium pressure pipe installation work between Jwicheon and Imrang (Section 1) 331,760,000 09.11 ~ 10.03 Busan City Gas
    61 New district heating construction 197,800,000 09.09 ~ 09.11 Busan City Gas
    60 Shinpyeong 2-dong 370-47 Daeshin Glass medium pressure pipe installation (packaging) 116,170,000 09.09 ~ 09.10 Busan City Gas
    59 Medium pressure pipe LOOP construction between Noksong Bridge No. 3 and 1534 Songjeong-dong 156,480,000 09.09 ~ 09.12 Busan City Gas
    58 Medium and low pressure pipe laying work around Bujeon Apartment, 768-4, Samseong-ri, Gijang-gun 158,800,000 09.07 ~ 09.10 Busan City Gas
    57 Cheolma-Bansong medium pressure pipe LOOP construction (Section 1) 247,200,000 09.07 ~ 09.10 Busan City Gas
    56 Gupo 1-dong 456-1 Gupo Market area supply pipe construction (Section 3) 120,538,000 09.06 ~ 11.03 Busan City Gas
    55 Jeonggwan Agricultural and Industrial Complex ~ Yerim Intersection medium pressure pipe installation work (Section 1) 144,860,000 09.06 ~ 09.09 Busan City Gas
    54 Hwajeon Industrial Complex medium pressure pipe installation work (Section 2-3) 113,560,000 09.05 ~ 09.08 Busan City Gas
    53 Yerim-Jwacheon medium pressure pipe laying work (Section 2) 326,580,000 09.03 ~ 09.12 Busan City Gas
    52 Cheolma-Bansong medium pressure pipe laying work (Section 2) 145,420,000 09.03 ~ 09.06 Busan City Gas
    51 Gas facility construction during new construction of STX KAN Apartment in Beomeo-dong, Daegu 144,500,000 09.01 ~ 10.09 STX Construction
    50 Daecheong Marynoll Underground Pressure Machine ~ Daecheong Saddle Pressure Machine LOOp Construction 102,760,000 08.12 ~ 09.03 Busan City Gas
    49 #5CCL gas piping construction 370,000,000 08.11 ~ 09.07 union steel
    48 Danggam 1-dong 271 Danggam Elementary School supply pipe construction (Section 2) 131,840,000 08.07 ~ 09.01 Busan City Gas
    47 Medium pressure pipe installation work between Deukcheon Samgeori in Gangdong-dong and Korean Air in Daejeo-dong (Section 2) 155,736,000 08.07 ~ 08.10 Busan City Gas
    46 #5CCL city gas pipe manufacturing and installation work 110,000,000 08.06 ~ 09.02 Busan City Gas
    45 Medium pressure pipe laying work between Jeonggwan and Iron Horse (Section 1) piping work 337,860,000 08.04 ~ 09.02 Busan City Gas
    44 Supply pipe construction work around Cheonghak Elementary School, 412 Cheonghak 1-dong (Section 1) 137,840,000 08.04 ~ 08.08 Busan City Gas
    43 Supply pipe LOOP construction and medium pressure pipe relocation (consignment) around the botanical garden at 807 Jangjeon 2-dong 138,990,000 08.04 ~ 08.07 Busan City Gas
    42 Gangdong-dong National Route 14-Deukcheon Intersection Medium Pressure Pipe Construction (Section 3) 224,410,000 07.12 ~ 08.03 Busan City Gas
    41 Sinseondae Pier city gas inlet construction 104,500,000 07.12 ~ 08.01 Sinseondae Container Terminal
    40 Supply pipe relocation work due to installation of new sewage box at 497 Suyeong-dong (consignment) 111,680,000 07.11 ~ 08.06 Busan City Gas
    39 Supply pipe construction work in 904, Choryang 4-dong 159,520,000 07.08 ~ 07.11 Busan City Gas
    38 Supply pipe construction work (packaging) at 904beonji, Choryang 4-dong 115,490,000 07.08 ~ 07.11 Busan City Gas
    37 Yongho 2-dong San 185 Oryukdo SK-VIEW medium, low pressure and GOV installation 245,870,000 07.06 ~ 08.05 Busan City Gas
    36 Supply pipe construction work at 421 Deokpo 1-dong (Section 3) 157,590,000 07.06 ~ 07.10 Busan City Gas
    35 Supply pipe construction work at 421 Deokpo 1-dong (Section 3) - Packaging 119,910,000 07.06 ~ 07.10 Busan City Gas
    34 Supply pipe construction work throughout Gamcheon 1 and 2-dong (Section 3) 168,900,000 07.05 ~ 07.12 Busan City Gas
    33 Gamcheon 1,2-dong supply pipe construction (Section 3) - Packaging 109,740,000 07.05 ~ 07.10 Busan City Gas
    32 Supply pipe construction around Gamcheon 1-dong 800 Gamjeon Dawn Market (Section 1) 162,490,000 07.04 ~ 07.10 Busan City Gas
    31 West 1, 2-dong area (4th) supply pipe construction (Section 1) 149,800,000 06.12 ~ 07.03 Busan City Gas
    30 Anak 1-dong 433 Lotte Castle Avenue medium, low pressure and GOV installation work 118,270,000 06.11 ~ 07.03 Busan City Gas
    29 Anak 1-dong 433 Lotte Castle Avenue medium, low pressure and GOV installation work 118,270,000 06.11 ~ 07.03 Busan City Gas
    28 Sujeong-dong 441 Suseong Apartment supply pipe construction (Section 1) 132,500,000 06.09 ~ 06.12 Busan City Gas
    27 Myeongji-dong Myeongji Saedongne medium and low pressure pipe and GOV installation work 206,900,000 06.08 ~ 06.11 Busan City Gas
    26 Supply pipe LOOP construction between Geumsa Samhan GOV and Seodong Samhan GOV 134,200,000 06.05 ~ 06.11 Busan City Gas
    25 Shinpyeong Relocation Complex Supply Pipe Construction at 161 Sinpyeong-dong (Section 4) - Packaging included 144,492,000 06.05 ~ 06.10 Busan City Gas
    24 Supply pipe construction around 165 Namhang-dong (Section 1) 123,400,000 06.02 ~ 06.04 Busan City Gas
    23 Myeongji-dong 1273 Noksan drainage pumping station medium pressure pipe relocation work 168,320,000 05.12 ~ 06.03 Busan City Gas
    22 Busan Jeonggwan City Piping Construction Medium and Low Pressure Laying Construction (1st) 454,000,000 05.09 ~ 06.11 Korea Development
    21 Banyeo-dong 22 medium pressure pipe pressure reinforcement work 106,910,000 05.09 ~ 05.10 Busan City Gas
    20 Subway section 321 medium pressure pipe relocation work (Dongrae Station) 245,370,000 05.06 ~ 06.06 Busan City Gas
    19 Metro Heights Apartment heat pipe entry and remote meter reading facility construction 107,018,181 05.06 ~ 05.07 Busan City Gas
    18 Supply pipe construction around Wooshin Goldville, 1048, Jaesong-dong 117,990,000 05.05 ~ 05.08 Busan City Gas
    17 Subway section 322 (Dongrae~Anrak intersection) medium and low pressure pipe relocation work 319,990,000 05.04 ~ 06.08 Busan City Gas
    16 City gas piping work 163,636,363 05.04 ~ 05.07 Busan Information University
    15 LNG MAIN pipe bypass work 470,000,000 05.01 ~ 05.03 union steel
    14 Subway section 321 medium pressure pipe relocation work (Dongrae Station) 245,370,000 05.06 ~ 06.06 Busan City Gas
    13 Metro Heights Apartment heat pipe entry and remote meter reading facility construction 107,018,181 05.06 ~ 05.07 Busan City Gas
    12 Supply pipe construction around Wooshin Goldville, 1048, Jaesong-dong 117,990,000 05.05 ~ 05.08 Busan City Gas
    11 Subway section 322 (Dongrae~Anrak intersection) medium and low pressure pipe relocation work 319,990,000 05.04 ~ 06.08 Busan City Gas
    10 City gas piping work 163,636,363 05.04 ~ 05.07 Busan Information University
    9 LNG MAIN pipe bypass work 470,000,000 05.01 ~ 05.03 union steel
    8 Medium pressure pipe construction between Sesan Intersection and Racecourse 334,620,000 04.12 ~ 05.04 Busan City Gas
    7 Macdo River dredging sand export and yarn band determination 120,000,000 04.10 ~ 04.11 Gangseo-gu Office
    6 Medium and low pressure pipe construction around 875 Dongwon Apartment in Janglim-dong 175,660,000 04.09 ~ 04.12 Busan City Gas
    5 Songjeong-dong Seongho Industry ~ Songjeong 3rd Bridge Medium Pressure Pipe Laying Work 203,000,000 04.03 ~ 04.04 Busan City Gas
    4 Supply pipe construction work around Hoedong-dong (Section 1) 112,480,000 03.02 ~ 03.04 Busan City Gas
    3 Supply pipe LOOP construction in Yeonsan 4-dong (Section 1) 176,460,000 02.07 ~ 03.01 Busan City Gas
    2 Supply pipe construction around Geumjeong-gu Office in Bugok-dong 130,820,000 02.10 ~ 02.12 Busan City Gas
    1 Busan Yeonji 2nd new construction project (gas facility construction) 167,500,000 01.08 ~ 02.04 claim